RACK RFQ INTAKE
Send LinkScope Sourcing 44 a rack brief
LinkScope Sourcing 44 reads the form on this page. No street address, switchboard, or social inbox is published, because those contacts are not on file. The reply path is the work email you type below.
- Intake is the form. Briefs are read on US business days after they arrive. No counter hours are posted.
- Write rack units, load, airflow, quantity, destination, and timing in the requirement field.
- Drawings follow a reply. This page has no upload control.
- A submission is a request for factory coordination. It is not a quotation and not a reservation.
What happens after you submit
- The desk checks that rack units, destination, and quantity are present.
- Open cells, such as hole pattern or caster load, are marked rather than guessed.
- Factories are asked for a quote on that sheet. Fit and listings stay with the model they name.
Optional budget needs a currency and a per-rack or whole-order basis. High-end, mid-range, budget, or undecided describes your preference only.
Three limits: no published phone, no map pin, and no promise of a same-day reply. If a cell is blank, the comparison waits.
Write the rack unit count as a rail opening, not as the carton height. A 9U rail is 15.75 in. External width is often discussed as 600 mm or 800 mm, and depth as 600, 800, 1000, or 1200 mm, but usable rail depth is the number that decides whether the deepest device fits. State square cage-nut holes or tapped 12-24 / M6. Static load and the lower caster figure are separate sentences.
If the bay is outdoors, ask the supplier later for the ingress protection code on that model. This form cannot assign one. Fans, a PDU, and a UPS stay off the empty-cabinet price unless you name them. Runtime, outlet count, and monitoring describe the power line. Power over Ethernet heat is only a reason to ask about door perforation.
Quantity is in racks or units. Destination should be a US ship-to the factory can price. Timing should say whether the week count starts at drawing approval or at a material lot. Currency and a per-rack or whole-order basis belong with any optional budget. The preference list is high-end, mid-range, budget, or undecided, and none of those words is a grade this desk has checked.